Novo Excipients Pvt. Ltd.
TOTAL COATING SOLUTION
 
 
  Wide spectrum of Products encircling all remedial categories
Manufacturing Facility
  Our Location :

We are located at Mahape (Navi Mumbai) which is 35 kms away from Mumbai & 16 kms away from Thane. A confectionary company and an engineering company is on the eastern side and western side respectively of our manufacturing facility where else a textile company
is located in the north.

  Construction Features :

Our manufacturing facility is constructed as per GMP guidelines with Ultra Modern Infrastructure & Equipments. It is made of R.C.C. construction with concrete ceiling and brick walls covered with plaster all over for a smooth clean finish.
The outer walls are of Siporex Bricks which are painted with non-peeling Acrylic Paint. Our flooring consists of smooth, mirror polished Kota Tiles and the gaps in between these tiles are filled with epoxy coating.

The internal partition & ceiling of each production department is constructed by Calcium Silicate partition & painted with Polyurethane (PU) with provision of square/round glass view panel at the appropriate height. For sealing the joints of the glass view panel with floor and ceiling, epoxy is being used as a connector between floor-wall & wall-ceiling.

Air handling units are arranged to control microbial contamination and dust particles. All the operational departments are facilitated with 10 µ pre-filters & 3 µ filter at terminal stage. All the precautions are taken to control the pollution during various operational stages by means of providing dust collectors outside the room of every operational cubicle.

Our production department is on the second floor to facilitate cleaning, maintenance and proper operation. It has adequate space which is subdivided into separate enclosed cubicles in the manufacturing area, blending area, primary & secondary packing room and bonded store room. Adequate lighting and ventilation are provided along with air handling units.

Our warehouse is also located on the second floor and it has adequate facility for storing and handling raw materials and packing materials.

  Goods Receipt Steps :

Goods are received at the main entrance and its initial inspection, dedusting and cleaning get done here. Then the material is transferred to Under Test Area where weight checking is performed. Sampling of the goods is done at RLAF Sampling Area.

  Storage :

All the raw materials are properly segregated and kept according to their status identification as below:
1.  Under Test Area.
2.  Approved Area.
3.  Rejected Area.


Home  |  Manufacturing Facility  |  Regulatory Licences  |  Products  |  Novomix Colour Guide  |  Quality  |  Contact Us  |  Sample Request / Technical Support
Copyrights 2013 @ Novo Excipients Pvt. Ltd. Disclaimer | Sitemap Credits
lebron 12 louis vuitton outlet Cheap Oakley Sunglasses Louis Vuitton Outlet sport blue 6s kate spade outlet michael kors outlet louis vuitton outlet Wolf Grey 3s Jordan 14 thunder michael kors outlet jordan 6 sport blue jordan 3 sport blue louis vuitton uk kate spade outlet foamposites sport blue 6s Lebron 12 sport blue 6s jordan 3 wolf grey